LINDISFARNE ROUNDABOUT
  •  

PROJECT STATS
Galliford Try Value: £630,000 Start date: July 2016 Contract length: 12 months
PROJECT SUMMARY The main focus of the £7.5m Lindisfarne scheme is the widening of both the Lindisfarne and John Reid Road roundabouts and the dual carriageway between them from two to three lanes in both directions. This includes new drainage and ducting. The junction had suffered severe flooding recently and to alleviate this a 1,125m3 attenuation tank was installed 6m deep.
CONTACT US
TESTIMONIAL

 

"During my time at Northern Counties Safety Group it is evident that Addison Plant regard safety as being equally important as quality and production.
At the core of their safety culture is an active involvement from the directors and senior management, which recognises that people are Addison Plants greatest asset.
It is positive and encouraging to see that the motivation to continually improve their safety culture is helping drive down accidents in our industry, with this years figures being at an all time low.
Even in these tough times for construction, Addison Plant have implemented a successful health and safety management system that should be seen as a benchmark to other civil engineering organisations.
With the company’s continual improvement and commitment to safety, it is my belief that Addison Plant are on the right track."
Craig Penketh CMIOSH SpDipEM NCSG Technical Health & Safety Practitioner
Telephone 01642 602666