ENERGY PLANT PORT CLARENCE, TEESSIDE
PROJECT STATS
  •  

Babcock & Wilcox Volund Value: £1m Start date: April 2018 Contract length: 13 months
PROJECT SUMMARY BWV took over the role as PC to complete the project after Lagan Construction went into administration. Our role was to assist them in completing all outstanding civils work. This included: • 700 m3 Tubosider storage tank, 3 leg 3.0m diameter. • Completion of any outstanding ducting and drainage. • Full road construction including kerbs and the final surface course. • Reinforced Concrete foundations. • Screeding of internal floors. • Diamond drilling/cutting for wall penetrations and openings. • Earthworks including attenuation pond and swale. • Installation of final effluent pumping station and soakaway. • Importing of 2,000 tonne of topsoil. We were responsible for managing and setting out our works, liaising with the client’s representative on site and seeing everything through to sign off by the completions team.
CONTACT US
TESTIMONIAL
"During my time at Northern Counties Safety Group it is evident that Addison Plant regard safety as being equally important as quality and production.
At the core of their safety culture is an active involvement from the directors and senior management, which recognises that people are Addison Plants greatest asset.
It is positive and encouraging to see that the motivation to continually improve their safety culture is helping drive down accidents in our industry, with this years figures being at an all time low.
Even in these tough times for construction, Addison Plant have implemented a successful health and safety management system that should be seen as a benchmark to other civil engineering organisations.
With the company’s continual improvement and commitment to safety, it is my belief that Addison Plant are on the right track."
Craig Penketh CMIOSH SpDipEM NCSG Technical Health & Safety Practitioner
Telephone 01642 602666