FLEXIBLE ENERGY GENERATION SALTHOLME
PROJECT STATS
Statera Energy Value: £720,000 Start date: Aug 2019 Contract length: 4 months
TESTIMONIAL
"During my time at Northern Counties Safety Group it is evident that Addison Plant regard safety as being equally important as quality and production.
At the core of their safety culture is an active involvement from the directors and senior management, which recognises that people are Addison Plants greatest asset.
It is positive and encouraging to see that the motivation to continually improve their safety culture is helping drive down accidents in our industry, with this years figures being at an all time low.
Even in these tough times for construction, Addison Plant have implemented a successful health and safety management system that should be seen as a benchmark to other civil engineering organisations.
With the company’s continual improvement and commitment to safety, it is my belief that Addison Plant are on the right track."
Craig Penketh CMIOSH SpDipEM NCSG Technical Health & Safety Practitioner
PROJECT SUMMARY We were awarded the enabling works for a gas-powered power station at Saltholme next to an RSPB site. The site itself brought about a number of challenges. It was a known site for archaeology, so the full site strip was witnessed by archaeologists. There were also 3 sets of overhead high voltage power lines and 3 high pressure underground gas mains on the site. Our work consisted of: • Setting up goal posts and complying with GS-6 • Providing temporary protection for the gas mains • Fencing off the full site • Strip 3,700m3 of topsoil and bund on site • Excavate 16,000m3 and bund on site • Import 31,000 tonne of stone • Cast 3 no reinforced protection slabs • Design and install bespoke culvert and headwalls • Excavate ponds and drainage ditch • Form new entrance and tie in to the A1185